Cambodia eTOD Project: Phnom Penh Airport
2019-2020

The surveyed airports were Phnom Penh International Airport (VDPP), Siem Reap International Airport (VDSR) and Sihanoukville International Airport (VDSV). Due to the large scope of this project, the Phnom Penh (VDPP) eTOD survey will be outlined.

Obstacle data collection involved high-resolution satellite imagery acquisition of the aerodrome and its surrounding area, supplemented by GCP surveys for georeferencing and optical ground surveys for the identification of potential obstacle features in the field. This additional ground survey obstacle data was integrated with data extracted from imagery. 

eTOD data extraction and terrain analysis was carried out in multiple stages according to ICAO defined aerodrome areas. Final datasets assembled into in a detailed eTOD GIS database for delivery. 

We conducted eTOD surveys of several international airports across Cambodia from October 2019 to April 2020 for Cambodia Air Traffic Services (CATS).

eTOD Data Extraction


Obstacle Collection Surface (OCS) Generation

Area OCS boundaries and OCS surface heights for each area were calculated according to ICAO Annex 15 guidelines. Individual OCS for areas 2, 3 and 4 were generated and then combined to produce a single obstacle collection surface for the whole project area.

The DSM and OCS were analysed for obstacles, extracting any points on the DSM with a higher elevation than the OCS into a DSM Obstacles GIS layer. This layer was used as a guide to obstacle capture and mapping extracted from captured satellite imagery.  

3D photogrammetric stereo mapping was used for data mapping building obstacles. 

Obstacle Data Extraction

Obstacle data (points, line and polygons) was extracted from derived DTM and DSMs by terrain analysis software, and extracted data was checked and verified using the 3D photogrammetric stereo mapping method.

Final obstacle data was assembled into an eTOD obstacle database via GIS mapping software, including all attributes, metadata, and the structure necessary to produce AIXM format eTOD.

All datasets were produced in compliance with ICAO specified resolutions and accuracies for Areas 2,3 and 4 in Annex 15. 